Insufficient grid coverage affects continuous operation of traditional crushing lines
Dispersed equipment and redundant processes lead to low overall efficiency
Rapid urbanization has created a growing supply gap for local sand and gravel
Frequent relocation of mining points makes fixed production lines difficult to adapt
| Indicator | Traditional Fixed Production Line | Mobile Crusher | Improvement |
| Installation and Debugging Time | 20-30 days | 7 days | Reduced by 70%-77% |
| Relocation Frequency | Not relocatable(fixed) | 2 relocations per year | Enables mine-following operation |
| Relocation Time Per Move | Not applicable | 5 days per relocation | Quick responsse to mining site changes |
| Power Solution | Grid-dependent | Generator set supported | 100% power supply guarantee |
| Production Stability | 60%-70% | Above 94% | Improved by over 30% |
| Energy Consumption Per Ton | 5.5kWh/ ton | 4.2 kWh/ton | Reduced by 24% |
Installation and commissioning completed within 7 days, saving 23 days compared to traditional methods
Annual operation time 330 days, average capacity 195TPH, exceeding design capacity by 2.5%
2 mine relocations completed within one year, each taking 5 days, saving 85% time compared to rebuilding
4.Production cost per ton reduced by 26%, payback period 6 months
Installation and debugging period shortened by 77%, commissioning speed increased by 3 times
2 relocations per year, each taking only 5 days, maintaining equipment utilization rate of 92%
Energy consumption per ton reduced by 24%, saving USD 150,000 annually in energy costs
| Feature | Traditional Jaw Crusher PE750×1060 | Impact Crusher PF1315 | Benefit |
| Energy Use | 110 KW | 200KW | 20% Savings |
| Downtime | 15% | 5% | Higher Production |
| Adjustment Time | 30 minutes | 15 to 30 minutes | Faster Changeovers |
WOCATO’s tyremounted mobile crushing station performed excellently in our Guinea project. While traditional solutions required nearly a month for installation, WOCATO’s equipment was operational in just 7 days, achieving an annual output of over 500,000 tons. We completed 2 relocations following mine progression within one year, each taking only 5 days, and the generator set ensured 24/7 stable production. This has provided solid support for our national major infrastructure projects.